Nuclear Power Plant Back Online
The plant had to be brought to a cold stop for repair works, which included replacing the principal components of the valve, located in the secondary section of the power plant.
The week-long shutdown was used for minor maintenance works, whereas the scheduled maintenance shutdown is expected in autumn